Breach Threatens Stability of Benazir Bhutto Bridge as River Erosion Widens at Minchan Spur
-
Erosion of Minchan spur threatens Benazir Bhutto bridge on Indus river. It has created a 50-foot breach.
-
The breach started on Friday when river flow was 150,000 cusecs. Nearby villagers are moving to safer places.
-
Irrigation officials and district administration visited site. Precautionary measures underway.
-
Locals allege substandard construction work, demand accountability of contractor.
-
NHA team inspecting site, contractor mobilized for repair work to avoid emergency.
